Local newsSource: Consorci de l'Alta Garrotxa

Access routes to Santa Maria d’Escales prepared for repair work

Access routes to Santa Maria d’Escales prepared for repair work

The Alta Garrotxa Consortium has cleared scrub and vegetation from the access routes and area around Santa Maria d’Escales. The work, announced on 20 November 2026, prepares the way for crews and materials ahead of upcoming repair and stabilisation work.

The work was carried out with the Amics de l’Alta Garrotxa association, which will lead and carry out the repairs with support and coordination from Girona Provincial Council. The planned work addresses, among other issues, structural problems in the hermitage walls and moisture linked to the collapse of dry-stone walls on the slope below.

Clearing the access routes is a preliminary step towards carrying out work on this heritage site in Alta Garrotxa. The work is part of the coordination between the authorities and the association to move forward with conserving and stabilising the site.

We're doing some maintenance

Online booking isn't available right now. Write to us at camping@sadernes.com and we'll get back to you as soon as we can.